House of Europe

Within 12 months, LAKE doo built two (interlinked) constructions, namely Unit B and Unit C, based on strict requirements of current tenants.

Within 12 months, LAKE doo built two (interlinked) constructions, namely Unit B and Unit C, based on strict requirements of current tenants.

Acting as an investor and the main contractor, with technical assistance of experts from international institutions, LAKE has managed to meet very high building standards within a short period of time, laying a special emphasis on safety standards.  

Currently, the following international institutions lease these premises: 

  • Delegation of the European Union to BiH
  • European Union Special Representative in BiH
  • Embassy of the Federal Republic of Germany in BiH

During both the designing and the construction stage, an emphasis was laid on achieving the maximum energy efficiency by reducing the exploitation of energy-generating products and decreasing the pollution rate.

Through its business operations, LAKE doo pursues an outermost humane exploitation of resources, both in the construction process by using adequate methods of design and installation of high-quality materials, and throughout the life span of its buildings, whereby the consumption has reduced significantly. 

Project:
House of Europe

Value of the investment:
11,3mio EUR

Period of construction:
March 2007 – February 2008

Investor:
LAKE d.o.o.

LAKE’s engagement in the Project:
Dealing with proprietary and legal relationships, project management, construction site management, supervision of the construction works, channeling and implementing construction standards of international governmental representation, contracting, and procurement.